{"id":11361,"date":"2026-01-01T11:37:44","date_gmt":"2026-01-01T11:37:44","guid":{"rendered":"https:\/\/www.carmowood.com\/portefolio\/luis-de-camoes-university-residence\/"},"modified":"2026-03-24T16:32:20","modified_gmt":"2026-03-24T16:32:20","slug":"luis-de-camoes-university-residence","status":"publish","type":"project","link":"https:\/\/www.carmowood.com\/en\/portefolio\/luis-de-camoes-university-residence\/","title":{"rendered":"Lu\u00eds de Cam\u00f5es University Residence"},"content":{"rendered":"\n<p>The Lu\u00eds de Cam\u00f5es University Residence is part of Coimbra\u2019s student housing development programme and has reached a key stage in its implementation, marked by the sequential assembly of the CLT (Cross Laminated Timber) structure.<\/p>\n\n<p>Site images illustrate the installation of vertical and horizontal structural panels using cranes, ensuring a high level of execution precision and controlled progress. The clear definition of levels, openings and internal layout reflects the high degree of planning and prefabrication inherent to the construction system.<\/p>\n\n<p>The works also highlight the careful integration between the new timber structure and the existing built fabric, ensuring structural compatibility and respect for the urban context. Vertical progression, supported by perimeter scaffolding, allows for a safe and rigorous execution process.<\/p>\n\n<p>A empreitada est\u00e1 a cargo da ABA, enquanto que a engenharia e execu\u00e7\u00e3o da estrutura em madeira ficou a cargo da CarmoForm em parceria com a Portilame, resultando num processo construtivo mais eficiente e sustent\u00e1vel.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction images show the installation of CLT structural panels, both vertical and horizontal, positioned using a crane and precisely integrated into the building\u2019s geometry.<\/p>\n","protected":false},"featured_media":13371,"parent":0,"menu_order":5,"template":"","project_cat":[438,442],"project_type":[476,488],"class_list":["post-11361","project","type-project","status-publish","has-post-thumbnail","hentry","project_cat-carmoform","project_cat-high-rise-buildings-and-offices","project_type-carmofarm","project_type-case-study-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/project\/11361","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":7,"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/project\/11361\/revisions"}],"predecessor-version":[{"id":12910,"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/project\/11361\/revisions\/12910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/media\/13371"}],"wp:attachment":[{"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/media?parent=11361"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/project_cat?post=11361"},{"taxonomy":"project_type","embeddable":true,"href":"https:\/\/www.carmowood.com\/en\/wp-json\/wp\/v2\/project_type?post=11361"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}